Project: Data Centre, London Docklands
24/7, 365 days a year response
Response for UK is within 4 hours
Data Centre, London Docklands
- Replacement 4x 1200kW Turbocor machines, Pumps, controls and electrical infrastructure on a critical LIVE datacentre
Challenges:
- Working within a LIVE datacentre environment with no disruption to services for entire duration of project
- Very tight basement location very similar to Smithson Plaza in a multiple tenancy building
- Strip down of plant meant attention to detail was paramount
- We were not allowed to impact any aspect of the building, we had to be ‘invisible’ to the operation of the building.
CLIENTS
Latest News
Project: Large UK Data Centre, Cardiff
24/7, 365 days a year response Response for UK is within 4 hoursLarge UK Data Centre, Cardiff Replacement 2x 1300kW Air cooled machines, Pumps, controls and electrical infrastructure on a critical LIVE datacentre Challenges: Working within one of the most critical UK...
Project: 41mW Battery Storage Centre
24/7, 365 days a year response Response for UK is within 4 hours41mW Battery Storage Centre, Birmingham Critical close control temperature and humidity N+1 system. TRANE Indoor air cooled chillers, 6x battery room AHUs, mechanical and electrical services. 150m3/hr...
Address
Unit 2, Great Western Place Station Road, Burlescombe, Tiverton, Devon, United Kingdom, EX16 7GW.
Phone
01823 662330
service@k4sltd.co.uk