Project: Data Centre, London Docklands

24/7, 365 days a year response

Response for UK is within 4 hours

Data Centre, London Docklands

  • Replacement 4x 1200kW Turbocor machines, Pumps, controls and electrical infrastructure on a critical LIVE datacentre

Challenges:

  • Working within a LIVE datacentre environment with no disruption to services for entire duration of project
  • Very tight basement location very similar to Smithson Plaza in a multiple tenancy building
  • Strip down of plant meant attention to detail was paramount
  • We were not allowed to impact any aspect of the building, we had to be ‘invisible’ to the operation of the building.

CLIENTS

Latest News

Project: Large UK Data Centre, Cardiff

Project: Large UK Data Centre, Cardiff

24/7, 365 days a year response Response for UK is within 4 hoursLarge UK Data Centre, Cardiff Replacement 2x 1300kW Air cooled machines, Pumps, controls and electrical infrastructure on a critical LIVE datacentre Challenges: Working within one of the most critical UK...

Project: 41mW Battery Storage Centre

Project: 41mW Battery Storage Centre

24/7, 365 days a year response Response for UK is within 4 hours41mW Battery Storage Centre, Birmingham Critical close control temperature and humidity N+1 system. TRANE Indoor air cooled chillers, 6x battery room AHUs, mechanical and electrical services. 150m3/hr...