INDUSTRIAL

Largest Operational Battery Storage Facility

Scope

Design and installation of the HVAC services to serve the largest battery storage plant in the UK at 41 Mega Watts. Challenges

Very tightly regulated internal conditions with temperature and humidity levels fluctuating no more than 5% respectively. Solutions

Design and installation of two turbocore chillers, six air handling units and associated distribution services.

Large Flagship Datacentre, Cardiff

Scope

Design and installation of the complete replacement of HVAC services for the 12,000 server datacentre.

Challenges

Change of service strategy from a three port constant flow system to a two port variable flow strategy, aiding in reducing energy consumption.

Change of chilled water flow temperatures from 6°C to 15°C to maximise free cooling and increase the efficiency of the chiller.

Solution

The main chiller plant was replaced along with 48 CRAC units; full service of the datacentre was maintained throughout.

Plessey Semiconductors, Plymouth

Scope

Design of additional chilled water plant.

Turnkey installation of 3.5MW centrifugal chiller and associated services.

Challenges

Design had to consider energy efficiency.

Small footprint equipment required to fit existing available space.

Connection to a live system without disruption to manufacturing process.

Solution

Selection of a Carrier 3.5mW chiller with integrated 700kW VSD drive.

Dismantle existing plant and provide specialist logistics and handling.

National Exhibition Centre

Scope

The complete replacement of the energy centre including 6 megawatts of chiller capacity. 

Challenges

The project needed to be completed within an 8 week window.

Solution

The project was actually completed within 6 weeks.

COMMERCIAL

County Gates, Bournemouth

Scope

Replacement chiller plant and pump, controls.

Provision of packaged plantroom.

Challenges

Noise sensitive location with adjacent residential properties.

Lack of space available plant.

Solution

Utilisation of super low noise Hitachi chiller with inverter control compressors and EC fans.

Small footprint packaged pump and control room, designed fabricated in-house by K4S.

Pyramids Leisure Centre, Exeter

Scope

Replacement of dehumidification plant for Main Swimming Pool and Learner Swimming Pool.

Replacement of air handling plant serving the changing room areas.

Solution

Off-site delivery of new plant into K4S factory unit.

Dismantle of the new equipment into component form and provide specialist logistics and handling to reassemble and test on-site.

CLIENTS

Latest News

Project: Data Centre, London Docklands

Project: Data Centre, London Docklands

24/7, 365 days a year response Response for UK is within 4 hoursData Centre, London Docklands Replacement 4x 1200kW Turbocor machines, Pumps, controls and electrical infrastructure on a critical LIVE datacentre Challenges: Working within a LIVE datacentre environment...

Project: Large UK Data Centre, Cardiff

Project: Large UK Data Centre, Cardiff

24/7, 365 days a year response Response for UK is within 4 hoursLarge UK Data Centre, Cardiff Replacement 2x 1300kW Air cooled machines, Pumps, controls and electrical infrastructure on a critical LIVE datacentre Challenges: Working within one of the most critical UK...

Project: 41mW Battery Storage Centre

Project: 41mW Battery Storage Centre

24/7, 365 days a year response Response for UK is within 4 hours41mW Battery Storage Centre, Birmingham Critical close control temperature and humidity N+1 system. TRANE Indoor air cooled chillers, 6x battery room AHUs, mechanical and electrical services. 150m3/hr...

Address

Unit 2, Great Western Place Station Road, Burlescombe, Tiverton, Devon, United Kingdom, EX16 7GW.

Sitemap

Phone

01823  662330

Follow Us